Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
why should a risk assessment be carried out | 1.65 | 0.7 | 3289 | 19 | 43 |
why | 1.53 | 0.9 | 6892 | 19 | 3 |
should | 1.77 | 0.4 | 6947 | 68 | 6 |
a | 0.13 | 0.5 | 701 | 5 | 1 |
risk | 1.77 | 0.8 | 7890 | 36 | 4 |
assessment | 0.24 | 0.1 | 8759 | 65 | 10 |
be | 1.03 | 0.8 | 5950 | 8 | 2 |
carried | 0.37 | 0.6 | 4211 | 63 | 7 |
out | 1.31 | 0.3 | 3170 | 89 | 3 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
why should a risk assessment be carried out | 1.83 | 0.1 | 5214 | 36 |
when should a risk assessment be carried out | 1.06 | 0.1 | 4336 | 14 |