Keyword Analysis & Research: cjl

Keyword Analysis


Keyword Research: People who searched cjl also searched

Frequently Asked Questions

When should the CJL be used?

That is, the CJL should be used in the circumstance where the flood control structure is designed such that the crest of the structure is at or below the elevation of the CJL, allowing the normal reach of the tide upstream.

What is CJL camp?

Camp Juliette Low is a private, non-profit summer camp for girls ages 8 to 17, accredited by the American Camp Association. CJL provides campers with fun and exciting ways to become more confident and competent, individually and in groups, through one-week and two-week outdoor residential programs.

Why choose CJL engineering?

Established in 1938, CJL Engineering works with many highly diverse clients on a remarkable range of project types. Every project is unique, important, and designed with accuracy and efficiency. Our Subject Matter Experts are recognized for mastering some of the most challenging projects in the region.

What is the CJL technical report?

The CJL Technical Report details the methodology that was implemented for these calculations. These elevations are for use in all Structures, Dredging and Fill and Certificate of Permission applications submitted on or after October 1, 2012. The following CJL elevations correspond to the North American Vertical Datum of 1988 (NAVD88).


Search Results related to cjl on Search Engine